istanbul, Istanbul, Turkey
$10/hr · Starting at $30
I am a civil engineer with 2 years of professional experience. I have been working in the design of reinforced concrete and 6 months with steel structures. I am expert in Autocad , Sta4cad , Idecad ,…
islamabad, Federally Administered Tribal Areas, Pakistan
$10/hr · Starting at $250
Architectural and structural design of any kind of structure. for example buildings, homes, offices, hospital, educational buildings.
Seroa, Porto, Portugal
$15/hr · Starting at $30
-autocad (technical drawings, 3d constructions) -photoshop -the gimp -illustrations -translations (french/english/portuguese) -transcriptions -microsoft tools (word, excel, power point, publisher) -gr…
AHMEDABAD, Gujarat, India
$8/hr · Starting at $25
2 years experience in Autodesk Revit. Exploration development of BIM technology in India , Also Working As A Part Time Faculty So Am Good In Communication As Well AS To Understanding The Project
Karachi, Sindh, Pakistan
$8/hr · Starting at $30
Providing services for civil engineering field in the sectors of Auto CAD Drawings and Project Management or Project Planning is required. Project Planning is done on MS Project and Primavera Software…
Riyadh, Ar Riyad, Saudi Arabia
$5/hr · Starting at $25
I have 30 years experience in all technical office aspects for both superstructure and infrastructure works Autocad, Primavera, Excel, Revit Cost Estimation, Quantity surveying, Drafting
Pune, Maharashtra, India
I am a Civil Engineer and postgraduate in Construction management. I am good at project management, specifically CAD drawings, project planning, Microsoft Project, Primavera, candy, excel, estimation
Lucena, Calabarzon, Philippines
$20/hr · Starting at $50
professional service 1. architectural plan 2. structural plan 3. electrical plan 4. plumbing & sanitary
Shimla, Himachal Pradesh, India
$10/hr · Starting at $25
I am highly motivated, creative and enjoy learning news skills." I've completed 3 years Diploma (Civil engineering)+ B.tech (Civil Engineering)
Kottayam, Kerala, India
$11/hr · Starting at $75
Exrienced structural drafting with AutoCAD, Assistance in Project Management using Primavera, MS Project.
thrissur, Kerala, India
$15/hr · Starting at $35
With over 3 Years of experience under my field, I am the PERFECT one for your project. As a QUANTITY SURVEYOR i specialize in quantity takeoff and Estimation of small to high raised building structure…
Delhi, Delhi, India
$25/hr · Starting at $25
Wide and proven excellence Experience of working in nearly USD 350 million (Rs. 2000crore) in Indian government projects Urban railways (metro railway) & Telecom projects. Working knowledge of FIDIC
$5/hr · Starting at $80
An enthusiastic Civil engineer . Who is good in Project Management and Project planning. I can schedule project on primavera P6 or MSP and can perform EV analysis, Cost control charts, resource graphs…
Williamsburg, Virginia, United States
$12/hr · Starting at $100
SAP Systems; Microsoft Word, Excel, Outlook and Access; Primavera Expedition (V. 6.5 and up)Blueprint Reading IMS Project 2000 (Introductory) certifiedCreative, proactive, flexible, and willing to ass…
Kochi, Kerala, India
I am well versed in content writing, creative writing and other academic writing. Also I have expertise in Autodesk Revit, Autocadd and Primavera softwares. I also do designing works. So don't be shy.…
Mississauga, Ontario, Canada
ID Verified
$40/hr · Starting at $80
More than 15 years of professional experience. I put a lot of effort in Quality checking, performance optimization and user interface. I will discuss the project before starting to determine the logic…
Lahore, Punjab, Pakistan
$15/hr · Starting at $75
Skilled and result oriented professional with more than 18 years of experience in Project Management , SAP ERP Implementation (E2E and rollouts), and Software Development SAP Certified Solution Consul…
Islamabad, Islamabad, Pakistan
I am a professional Civil Engineer with Masters in Project Management; I specialize in 2D or 3D drafting using software such as AutoCAD, Services offered – Create CAD drawings from sketches, Image, PD…
giza, Al Jizah, Egypt
-Preparing Weekly & Monthly progress report as per the Company Quality Assurance Procedures, including: a.Planning analysis report. -Preparing the Master Contract programme (Clause 14). -Preparing a r…
Abu Dhabi, Abu Dhabi, United Arab Emirates
I am currently working as Planning Engineer, included in my work are creating baseline programme, updated programme, revised programme, extension of time programme, progress monitoring, creating cashf…