Engineering & Architecture
Engineering (Mechanical / Chemical / Civil / Electrical)
Lighting Design
Lutron
Project Scope:
- System Assessment:
- Review the current Lutron RadioRA 2 system configuration (currently using version 12.10.0).
- Assess and identify any discrepancies or issues causing one of the main repeaters to appear offline when saving the configuration.
- Validate the programming and device configurations for the following hardware:
- Two Main Repeaters: Lutron RR-MAIN-REP-WH RadioRA 2 Main Repeaters.
- Two Auxiliary Repeaters: Lutron RR-AUX-REP RadioRA 2 Auxiliary Repeaters.
- Lutron Connect Bridge: Configure and integrate the Connect Bridge to enable remote access via the Lutron app.
- Software Upgrade:
- Upgrade the Lutron RadioRA 2 system software to the latest version.
- Ensure compatibility of the new version with all existing devices and programming.
- Test and validate the upgraded system for proper functionality.
- Configuration and Restoration:
- Troubleshoot and restore the system programming to bring the offline repeater online and ensure proper functionality across all repeaters.
- Reconfigure the remote switches to reconnect them to the system (appearing to be reset to factory defaults).
- Validate that the programming is correct, ensuring all connected devices (e.g., dimmers, keypads, and sensors) are functioning as expected.
- Back up the system configuration post-upgrade and restoration for future reference and safety.
- System Testing:
- Perform full system testing across both facilities to ensure proper communication between repeaters, switches, and control devices.
- Conduct tests for seamless communication between auxiliary and main repeaters.
- Provide documentation on the system’s current state, including a map of all repeaters and devices connected.
- Optimization and Recommendations:
- Review the current setup and suggest optimizations for enhanced system performance.
- Identify any additional hardware or software updates that may be necessary to improve the reliability of the system.
- Post-Restoration Support:
- Offer support post-restoration and upgrade for troubleshooting and fine-tuning over a 2-week period to ensure stability.
Qualifications:
- Proven experience with Lutron RadioRA 2 system setup, programming, upgrading, and troubleshooting.
- Familiarity with version 12.10.0 of the Lutron software and ability to perform system upgrades.
- Experience working with Lutron RR-MAIN-REP-WH Main Repeaters, RR-AUX-REP Auxiliary Repeaters, remote switches, and the Lutron Connect Bridge.
- Ability to reconfigure switches reset to factory defaults and integrate the Connect Bridge with the mobile app.
- Ability to work remotely and provide effective support through virtual consultations.
- Strong attention to detail in restoring configurations and ensuring system reliability post-upgrade.
Timeline:
- Expected project completion: 1-2 days from project initiation.
Budget:
- To be negotiated based on experience and scope.
... Show more