After resolving the clashes among all the trades (Architecture, Structure, Concrete,Mechanical, Electrical, Plumbing, Fire Protection, etc.), I generate a coordinated BIM model. Clashes are resolved through Web meetings / sharing clash reports/snapshots. Clashes are resolved by re-routing utilities, changing elevation, and resizing. Value Engineering is also offered to improve system efficiency, reduce costs, and easier construction and maintenance.