• Reviewed drawings and made necessary modifications in the soft copy (AutoCAD) as suggested by the manager and discussed the changes with the client.
• Calculated the volume of (concrete, shutter and other materials) required to cast the structural members as per the site plan and executed within the day.
• Arranged Bar Bending Schedule (BBS) for the required structural members
• Prepared work schedule with great consideration for time-off requests, labor rules, and worker readiness.
• Estimation and Bill preparation based on CPWD and MoRTH (Indian standard )
• Replaced Excel scheduling format with construction scheduling software which resulted in a 50% reduction in Labor Cost and improved work output by 90%.