Importing Existing Ground and Preparing Surface Analysis of Water Shed, Slopes, Contours, Directions, Elevations, Slopes & Slope Arrows using by Civil3D.
Calculating Volumes of bulk excavated, cut & filled quantity and finding the total area of asphalt pavement to assist the Road Design Engineer & Quantity Surveyor.
Comparison of Existing and Proposed Ground for the Quantity of cut & fill, Volume with Grid Elevation.
Calculate & preparing of proposed Underground Utilities Layout, Profiles, Chamber Cover Level, Invert Level, Depth, Length of Pipe, MH Coordinates, Pipe line bearing, Slope & Type of Chambers).
Responsible for creating Proposed combined service drawing (CSD) for checking conflicts with the Civil & Mechanical underground services using by AutoCAD, Civil3D & MS Excel.
Preparing Parcel Creation, Proposed Grading, Earthworks Layout Plan, Grading Grid Plan, Cut & Fill Plan, Contour Plan, Formation Level & Finished Ground Road Level.
Quantity of Road Construction Pavement Materials.
Preparing Road Cross Section of Individual Distance (Cut, Fill & Volume)
Very good knowledge of Sewerage & Drainage related calculation with MH Production Schedule.
Very good Knowledge of AutoCAD, Micro Station, Civil3D & MS Office.