1) Services for Consultancy firms: • Producing bills of quantities based on International standards “CSI & POMI”. • Quantifying construction works at the various stages of a project; i.e. quantities verification and pricing the BOQs based on design/IFC drawings, specifications, BOQ preamble and the bid methods of measurement. • Preparing bidding documents based on different International contract forms such as FIDIC or other forms in compliance with the client needs and project restrictions. • Identifying the particular contract conditions and bid requirements such as bid bond amount, insurances, performance bond amount/percentage, retention, VAT, currency, liquidated damages, provisional sum (defined/undefined) items, …etc. • Preparing technical and financial evaluation criteria to meet the client objectives. • Issuing of bids’ invitations, terms of reference, and request for proposals. • Preparing and updating the project cost estimates during the different design and construction stages. • Providing evaluation report for the client based on the received technical and commercial proposals from pre-qualified bidders or contractors. • Resolving quality issues in cooperation and close coordination with the design team, technical team, supervision team, and the client representatives to improve the quality of works and meet the allocated client’s budget. • Monitoring the actual construction costs and providing the client with financial advices to take the necessary action at the right time to avoid extra constructions costs, time extensions, claims and disputes which could be raised by the contractors. • Issuing instructions to the contractors as the construction works require. • Monitoring and evaluating the overall progress of works. • Other. 2) Services for Contracting firms: • Verifying the tender bills of quantities and highlighting the overestimated and underestimated items to be used for strategic pricing purpose. • Reviewing the tender contract form and particular conditions in parallel with the tender drawings, specifications, BOQ preamble, and the considered methods of measurement. • Pricing tender documents and preparing the required price analysis, overhead and construction costs. • Preparing the cost estimate for the tender including the direct and indirect costs, Value Added Tax- if any, overhead and profit after identifying the tender scope of work and required construction works, required construction time and services in compliance with the tender pricing documents. • Identifying the pricing risks due to material inflation, currency fluctuation …etc. • Establishing the source of origin contacts list. • Controlling the purchase orders for the material to be delivered to site based on IFC drawings or approved shop drawings and approved material. • Updating the budget and cash flow based on actual construction on site and doing the cost to complete exercise regularly during the construction works. • Others.