Professional Power system consultant with competent experience of 7+ years in the field of Power system studies and Design Engineering. An Ex ETAP employee followed by an EPC. I have worked on several power system projects with variety of contingencies including projects from Gulf, Europe and South Asian Countries. Can be a solution provider to the needs for ETAP studies like Load Flow, Short Circuit, Motor Acceleration,Harmonics, Relay Coordination, Transient Stability etc.