=>Preparation of Electrical Drawings. •Preparation of Shop Drawings. •Rectifying of drawing due to Coordination of M.E.P. actual work at site. •Preparing Schematic/Single Line Diagram for all disciplines. •Working on MEP coordination drawing (Underground & above false ceiling, reflected ceiling coordination). •For the As built drawings visit the site and prepare the as built drawing according to site work. •Follow the QA/QC instruction for quality and standard the drawings. •Preparing Sketches for Request for information (RFI). •Issuing the latest drawing for site, and coordinating with Project engineer, site engineer and site foreman. •Working on drainage & water supply shop drawings. •Working on MEP coordination drawing (above false ceiling & reflected ceiling coordination ground floor). •Rectifying of drawing due to Coordination of Architectural, Structural, and Mechanical, Electrical Shop Drawings. •Preparation of Electrical Load Schedule . •Project Planning. •Material Estimation. •Preparation Of MEP Materials List. •Preparation of Coordination Design Included All Disciplines. •Manage and Supervise Site Activities.