Banner Image

All Services

Engineering & Architecture engineering (mechanical / chemical / civil / electrical)

Quantity Survey and Material Estimator

$5/hr Starting at $25

I will be providing Quantity Estimate of buildings.

I will be providing Bill of Quantity (BOQ) Sheet required Tendering (Extra Charges may be applied).

All Materials Calculation be done as per Various Drawing such as Architectural floor plans, Sectional, Elevation and center line Plans of building.

Mode of measurement for calculation will be according IS (Indian Standard) 1200.

 Measurement Calculation will be as per SI (International Standard) units.

CPWD (Central Public Work Department) Norms and specification will be taken into consideration.

Material Estimation helps client to Know the required material to execute the work

It helps to estimate budget and control wastages. 


DETAILS REQUIREMENT FROM CLIENTS 

  1. Architectural drawing of all floors (dwg and pdf)
  2. Sectional detailing and Elevation Plan of various part of building eg staircase. (dwg and pdf)
  3. list of quantity to be included and excluded eg electrical wiring, sanitary and plumbing work and interior furniture work (sofa, bed, cupboard, AC, etc). 
  4. Example of Drawing Sample to be provided - Drawing Sample

 

Services for Client.

  • Excel File.(Material Calculation and Abstract Sheet ).
  • Example Work Sample - work sample


Duration of completion - 1 to 3 days mostly and also depend on size of project it may also complete early.

payments terms - It may vary depends on nature and size of project.

 

 





About

$5/hr Ongoing

Download Resume

I will be providing Quantity Estimate of buildings.

I will be providing Bill of Quantity (BOQ) Sheet required Tendering (Extra Charges may be applied).

All Materials Calculation be done as per Various Drawing such as Architectural floor plans, Sectional, Elevation and center line Plans of building.

Mode of measurement for calculation will be according IS (Indian Standard) 1200.

 Measurement Calculation will be as per SI (International Standard) units.

CPWD (Central Public Work Department) Norms and specification will be taken into consideration.

Material Estimation helps client to Know the required material to execute the work

It helps to estimate budget and control wastages. 


DETAILS REQUIREMENT FROM CLIENTS 

  1. Architectural drawing of all floors (dwg and pdf)
  2. Sectional detailing and Elevation Plan of various part of building eg staircase. (dwg and pdf)
  3. list of quantity to be included and excluded eg electrical wiring, sanitary and plumbing work and interior furniture work (sofa, bed, cupboard, AC, etc). 
  4. Example of Drawing Sample to be provided - Drawing Sample

 

Services for Client.

  • Excel File.(Material Calculation and Abstract Sheet ).
  • Example Work Sample - work sample


Duration of completion - 1 to 3 days mostly and also depend on size of project it may also complete early.

payments terms - It may vary depends on nature and size of project.

 

 





Skills & Expertise

BOQ EstimationBOQ PreparationCivil EngineeringEstimationEstimatorMaterial AnalysisMaterial EstimatorQuantity SurveyQuantity SurveyingQuantity Surveyor

0 Reviews

This Freelancer has not received any feedback.