7 years’ experience in Refinery maintenance, LPG Terminal Operation, Commissioning

& Maintenance. Refinery side I have experience of 5 plant shutdown/turnaround like

NHT/CCR, DTA-FCCU & HMU and routine plant maintenance also. LPG terminal side I

have experience of Commissioning, Operation, and maintenance of cryogenic Mundra

LPG terminal Pvt Ltd and Currently working in Supergas LPG import terminal

Porbandar as Terminal Engineer.


My Core competencies as below:- 
 
(1) Equipment Maintenance (Static and rotary). Pressure vessel, Heat exchangers & Distillation column
(2) Plant maintenance.
(3) Troubleshooting & Analysis
(4) Pre Commissioning & Commissioning 
(5) Turnaround & shutdown.
(6) Piping and Fabrication
(7) Codes and standards
(8) Contract management
(9) Primavera P6 (Certification)
(10) SAP PM & MM (Certification)
(11) P&ID, PFD & GA drawing
(12) Terminal operation.
(13) Pump Maintenance.
(14) Troubleshooting & Analysis
(15) PLC SCADA & DCS.


Completed Project:- 

(1) 6 nos of Horton sphere hydrotest in year 2024 (In progress)
(2) Cross country pipeline repair and replacement of 700 metre in year 2023 
(3) Pre Commissioning & Commissioning of Mundra LPG terminal Pvt Ltd in year 2019:- Mundra LPG terminal is designed to handle Domestic LPG, Automotive LPG, Propane and Butane. Terminal is having capacity of 50000 MT storage and The terminal is designed for send out capacity of LPG with 1.34 MMTPA.
My core competencies is as below. 
(4) Nayara Energy Major turnaround in year 2018:- Completed turnaround of Hydrogen unit as Team lead. I was taking care of for shutdown activities of pressure vessel, Columns and heat exchangers.
(5) RIL SEZ HMU Shutdown in year 2018:- Completed shutdown in RIL hydrogen complex as Engineer- Maintenance Mechanical.
(6) RIL DTA FCCU Shutdown in year 2017:- Appointed as Site engineer in DTA-FCCU plant shutdown. I was taking care for gasket and valve gland replacement job.
(7) Essar oil Mega shutdown in year 2015:- I was deputed in NHT/CCR plant for shutdown maintenance activities. I had completed shutdown of 21 pressure vessels and 3 columns.

About

$5/hr Ongoing

Download Resume

7 years’ experience in Refinery maintenance, LPG Terminal Operation, Commissioning

& Maintenance. Refinery side I have experience of 5 plant shutdown/turnaround like

NHT/CCR, DTA-FCCU & HMU and routine plant maintenance also. LPG terminal side I

have experience of Commissioning, Operation, and maintenance of cryogenic Mundra

LPG terminal Pvt Ltd and Currently working in Supergas LPG import terminal

Porbandar as Terminal Engineer.


My Core competencies as below:- 
 
(1) Equipment Maintenance (Static and rotary). Pressure vessel, Heat exchangers & Distillation column
(2) Plant maintenance.
(3) Troubleshooting & Analysis
(4) Pre Commissioning & Commissioning 
(5) Turnaround & shutdown.
(6) Piping and Fabrication
(7) Codes and standards
(8) Contract management
(9) Primavera P6 (Certification)
(10) SAP PM & MM (Certification)
(11) P&ID, PFD & GA drawing
(12) Terminal operation.
(13) Pump Maintenance.
(14) Troubleshooting & Analysis
(15) PLC SCADA & DCS.


Completed Project:- 

(1) 6 nos of Horton sphere hydrotest in year 2024 (In progress)
(2) Cross country pipeline repair and replacement of 700 metre in year 2023 
(3) Pre Commissioning & Commissioning of Mundra LPG terminal Pvt Ltd in year 2019:- Mundra LPG terminal is designed to handle Domestic LPG, Automotive LPG, Propane and Butane. Terminal is having capacity of 50000 MT storage and The terminal is designed for send out capacity of LPG with 1.34 MMTPA.
My core competencies is as below. 
(4) Nayara Energy Major turnaround in year 2018:- Completed turnaround of Hydrogen unit as Team lead. I was taking care of for shutdown activities of pressure vessel, Columns and heat exchangers.
(5) RIL SEZ HMU Shutdown in year 2018:- Completed shutdown in RIL hydrogen complex as Engineer- Maintenance Mechanical.
(6) RIL DTA FCCU Shutdown in year 2017:- Appointed as Site engineer in DTA-FCCU plant shutdown. I was taking care for gasket and valve gland replacement job.
(7) Essar oil Mega shutdown in year 2015:- I was deputed in NHT/CCR plant for shutdown maintenance activities. I had completed shutdown of 21 pressure vessels and 3 columns.