My mission is to have my own company design to construction, with my 12 years experience I can move forward so that later can reach my goal.º
JOB EXPERIENCE
• GyM S.A. Grupo Graña y Montero (May 2014 – Present)
Position: Civil Designer - Senior
Project Name: Huacho - Pativilca Highway - 2nd Stage
Developed Activities:
- Responsible of Blueprints and Geometric Design 54 KM
- Responsible of Road Interchanges
- Responsible of Vehicle Overpasses
- Responsible of Quarries and DME Developments
- Development from Plant Drawings and Profiling.
- Elaboration of Stakeout Datum
- Elaboration of Metered By KM.
- Elaboration of Monthly Progress of Cutting and Filling.
- Field Inspections as Topography Support.
• Semco CAD – Soluciones y Capacitaciones CAD
(December 2013 - March 2014)
Position: Instructor (Saturday - 5 Hours)
Curso: AUTODESK PLANT DESIGN SUITE
Developed Activities:
Teaching AutoCAD P&ID software, Plant 3D software and a small entrance to Navisworks, 30-hour course, in which I taught how to make P&ID diagrams, 3D modeling pipeline, creating specifications and reports.
• CAD ENGENHARIA & CONSULTORIA
(Freelance - 2013)
Brazilian Company - Manaus
Position: Freelancer / Civil Designer
Projects:
- NOVO HOSPITAL
AVENIDA TORQUATO TAPAJOS KM-09 LOTE 31-B NOVO ISRAEL
81,000.00 m2
- LOTEAMENTO MONTE CRISTO
RODOVIA MANOEL URBANO - Km 84 - MANACAPURU / AM
857,000.00 m2
- CONSTRUÇÃO DA ESTRADA DE LIGAÇÃO ENTRE OS
MUNICIPIOS DE CODAJÁS / ANORI – AM – PROJETO GEOMETRICO
CONSTRUCTIÓN OF THE ROAD BETWEEN THE MUNICIPALITIES OF CODAJÁS
69 Km.
Legal Representative / Chief of Engineering: Ing. Jesus Lopez
Developed Activities:
- Earth Movement Work.
- Access Designing.
• SAIPEM S.P.A. TALARA
(June 2009 - February 2011)
Position: “B” Designer
Project Names:
1. – PROJECT ALGERIA / OMAN FERTILIZER PROJECT MARINE TERMINAL ARZEW.
2. - PROJECT GORGON / BARROW ISLAND LNG PLANT - AUSTRALIA.
3. - PROJECT PUERTO NUEVO – COLOMBIA
Work Terms
The economic treatment converses directly with the employer via email or chat.