Mechanical Technical Office Section Head at (EAST) Engineering and services technology. (For Industrial Automating and Steel Structure activities)
* Receive the project file attached with the required specifications /and the project measurements taken by the site or factory engineer on nature (As built) from the Technical Office Manager.
* Study the project to determine the best in terms of quantities and sizes to ensure the effectiveness of the material usage for the project
* Prepare the BOM (bill of material) and Costing of the designed Warehouse to be used in Sales Quotation
* Create the executive drawings for the project (shop drawing) and confirm it with the consultant or the general contractor to proceed
* Send the work order to the production Dept. / financial Dept. attached with the specifications needed.
* Periodic follow-up with the site to know the project status
* Create the settlements documents for the project (during - the final), attached with the final as built documents and deliver it to the financial department
** Products of the Company
o Feeders of the concrete stations
o Bitumen tanks
o Solar, gases and water tanks
o Silos of building materials
o Truck scales
o Hangers and Metal Structures
** Projects were Involved
o Lafarge GEO Cycle factory at Suez (up to 500 tons)/sub-contractor
o New Egyptian Museum metal structures (up to 1500 tons) sub-contractor
o SANMAR, SAINI CEMENT, Mars truck scales
o SAMCRETE concrete Hanger at Sadat city
o Corona factory (e2) industrial park at 6th of October (up to 1200 tons