Banner Image

Skills

  • Bill of Materials
  • Building Estimation
  • Civil Engineering
  • Construction
  • Construction Estimating
  • Estimation
  • Material Take Off
  • Quantitative Research
  • Quantity Surveying
  • Software Cost Estimation

Services

  • Quantity Estimator

    $12/hr Starting at $25 Ongoing

    Dedicated Resource

    I have done Bachelor in Civil Engineering. I am expert at Quantity Estimation and Onscreen Take Off. I just need PDF Drawings and I will do the take off for you. I am in this business for more than 3...

    Bill of MaterialsBuilding EstimationCivil EngineeringConstructionConstruction Estimating

About

I deliver the accurate estimates for your constructions.

I have done Bachelor in Civil Engineering. I am expert at Quantity Estimation and Onscreen Take Off. I just need PDF Drawings and I will do the take off for you. I am in this business for more than 3 years and have done all kind of projects ranging from residential to commercial with all CSI divisions. I have been doing job in cost estimation for almost 3 years and I am really good at making accurate Excel sheets.

The projects I have dealt are majorly from USA. I have excellent skills in Plans Swift, Bluebeam Revu and MS Excel.

The Planswift takeoff sheet will include everything as per client's requirements and breakdown will be as much as client needs. Following are the divisions and their PricingI will work

1. Earthworks Cut&Fill, Excavation, Grading, Shoring, Pile
2. Civil Works, Pipes (stormwater, water, sewer, fire)
3. Concreting, Reinforcement
4. Masonry, Retaining Wall
5. Formworks
6. Structural Steel, Fire Proofing
7. Ceilings, Drywall, Partition
8. Painting, Rendering, Cladding
9. Floor Finishes, Tiling, Epoxy Floor
10. Roofing, Deck, Waterproofing
11. Architectural Precast, Glass Fiber Reinforced Concrete
12. Steel Balconies, Bolt on Deck, Canopies, Steel Railings
13. Doors, Windows, Roller Shades

What I need From You:
PDF Drawings and Instructions

What you will get:
Takeoff Excel Sheet
Pricing Done for Each Line Item

Turnaround is 2-3 working days depend on complexity of a project

Utilities,Landscaping and much more which includes general requirements and site work. I also do Renovation projects with demolition

Attachments (Click to Preview)