$8/hr · Starting at $25
I am Mechanical Design Engineer with 2 years of experience in design & development of Press tools, Line Replacement Units, Pharma Equipment's, Fabrication and Sheet-metal Enclosures., I execute all the...
Stress Analysis Jobs Accomplishments:• Stress Analysis of Pipelines of Rumaitha & Shanayel Facilities-Phase-III,NorthEast Bab,ADCO, 120 km Underground & Above ground 26” Oil Export Pipeline.• Stress Analysis of API 10000 Gas Injection Pipeline of 23.5 Km. • Stress Analysis of Water Injection Pipeline of 24 Km.• Man Hour Estimation, R&R Preparation & Man Power Planning.• Preparation of ITB summary/ Query ,flexibility spec & Work Instructions• P&ID Mark-up• Stress critical line list preparation• Selection of Pipe supports, spring and rod hangers.• Designing of special support.• Model analysis for frequency check.• Trunion check.• Analysis of Sphere Pump, Exchangers, Vessels, Column, Reboiler, Fire Heater,Plate fin Exchanger, Air Coolers connected lines• Analysis of blower lines• Combine analysis of Reciprocating and Centrifugal compressor lines.• Combine analysis of turbine lines.• Analysis of PSV lines (open and close)• Seismic and Wind analysis for lines • Analysis of line up to Super Critical Lines with High temperature 550C to -230 c .• Analysis of flange leakage as per ASME Section VIII and pressure equivalent method.• Preparation of spring material requisition.• Preparation of expansion joint material requisition• Preparation of many work instruction of wind, seismic, dynamic analysis, jacket pipe etc.• Preparation of ITB summary/technical Query.• FEA analysis• WRC 107/297• Knowledge of International codes and standards.• worked as co-coordinator for checking of critical piping stress analysis work done by Engineers India Ltd. In PDIL• Completed Cross Country Pipeline for Burrup Fertilizer Project (Ammonia Transfer line from Ammonia storage tank to loading station at Jetty) in PDIL• Piping Stress Analysis of Catalytic Cyclemax Regeneration Plant in Technip KTI.• Carried out stress analysis of Ammonia line between storage tank and Ammonia transfer pumps for Indo–Oman Fertilizer Project.• Worked as Area Stress lead Engineer
Founded: 1998
Designers
3D Designers
CATIA Designers
SolidWorks Designers
3D Modelers
has been previously hired for .
Would you like to rehire or request for a fresh quote?